Azure cost optimization

Reduce Azure costs without sacrificing performance or governance.

Emnode finds oversized resources and unnecessary cloud costs across your Azure environment, monitors spend growth and keeps optimization accountable. Connect Azure in minutes and see your first savings opportunities today.

Read-only managed identity · UK-hosted · Set up in minutes · No card needed until the trial ends

Emnode Cost Breakdown for Azure — 112,600 dollars across six categories with the top three holding 77 percent: Compute at 41,300 dollars, Databases at 28,700, Storage at 17,000 and Networking at 13,100, each with its month-on-month change and twelve-month trend

Setup

Takes minutes

A guided, read-only managed identity.

Price

From $79/mo

Unlimited users and cloud accounts.

Access

Read-only

No changes to your infrastructure.

Free trial

14 days

No card needed until it ends.

The problem

Azure spend grows subscription by subscription. Visibility doesn't.

Between multiple subscriptions, resource groups and teams deploying independently, Azure spend management becomes fragmented, and manual reporting can't keep up.

Fragmented visibility. Spend is scattered across subscriptions and resource groups; no one sees the whole picture.

Oversized VMs and disks. Resources provisioned generously "to be safe" keep billing at full rate month after month.

Manual reporting burns hours. Exporting cost data into spreadsheets every month, with no ownership or follow-through.

Governance pressure. Finance wants control and forecasts; engineering wants freedom to ship. The tool that could settle it sits inside Azure, behind a login finance doesn't have.

What you can cut

Your Azure waste, ranked by what it costs you.

Every opportunity grouped by type with the monthly saving against each — underutilized virtual machines, unattached managed disks, idle App Service plans, oversized SQL databases — so the biggest wins are obvious before anyone opens a ticket.

Emnode Action Hub with the cost queue open — 76 Azure savings opportunities worth 1,177.60 dollars a month, grouped by type and ranked by monthly saving, from right-sizing underutilized virtual machines at 412.80 down to a Log Analytics commitment tier at 18.90, alongside the compliance, reliability and monitoring queues

What's driving your Azure bill

Twelve months of Azure spend, and what moved it.

Every month broken out by category against the forecast band, then the Azure services that moved the bill priced individually.

Emnode Cost Drivers showing thirteen months of Azure spend by category against the forecast band, the current month part-billed with its projected remainder hatched, alongside 111,500 dollars spent across twelve complete months
Emnode showing what moved the Azure bill from June to July — Virtual Machines up 230 dollars, Azure App Service down 90 and Storage down 80, six services rising and two falling for a net movement of 240 dollars

Where your Azure spend sits

Every Azure subscription, one picture.

Spend across your whole Azure estate, sliced by category, by service and by subscription, so the biggest movers surface first.

Emnode Cost Explorer showing the top Azure services by spend — Virtual Machines, Azure SQL Database, Storage, Kubernetes Service and Azure Cosmos DB — each with its share of the bill
Emnode Cost Explorer showing Azure spend by category — Compute, Databases, Storage and Networking — each with its monthly total, month-on-month change and twelve-month trend line against a 112,600 dollar bill
Emnode Cost Explorer showing Azure spend by subscription — EML-WMS-Prod, EML-BI-Prod and EML-Corp-Test — each with its share of the bill

When something changes

Spend running outside its own baseline, flagged.

Anomaly detection watches daily cost against each account's normal range and raises what doesn't fit, so an unexpected increase surfaces while you can still do something about it.

Emnode flagging Azure spend outside its baseline — Azure SQL Database running 2.8x expected cost on EML-WMS-Prod at 420 dollars above baseline, Synapse 2.6x on EML-BI-Prod, with three older alerts already resolved
Start free trial Book a demo

Read-only managed identity · Set up in minutes · No card needed until the trial ends

What you get out of it

Identified, actioned, verified — and what it's worth.

Every saving tracked from the moment it's found to the moment it shows up on the bill, with the value at each stage and the conversion between them.

Emnode Progress Reporting savings pipeline — 638 opportunities identified worth 3,718 dollars a month, 214 claimed, 171 completed and 152 verified at 1,043 dollars a month, with the conversion rate between each stage

Savings you can prove

Verified, with a name against each one.

Every closed recommendation with the person who owned it and what it was worth per month, verified against the bill rather than estimated.

Emnode Action Hub validated list — closed Azure recommendations each with its owner and monthly saving, from right-sizing a virtual machine at 412.80 dollars a month down to releasing idle public IP addresses at 41.60

Connect Azure in minutes. Savings visible in your first session.

1

Connect

Deploy a read-only managed identity with our guided setup. No agents, no infrastructure changes.

2

See

Waste, anomalies and reservation gaps surface immediately, ranked by value.

3

Act

Assign owners, action the biggest savings first and track each one to completion.

4

Repeat

Monthly reviews catch new waste as your Azure estate grows and changes.

Multi-cloud ready

Running AWS too? One platform covers both.

Most Azure teams also run workloads on AWS. Emnode gives you one view of cost, compliance and reliability across both clouds, so you're not stitching together two sets of native tools. See the AWS cost optimization page for the AWS side.

One dashboard, both clouds

Azure and AWS spend, savings and risks side by side.

Consistent governance

The same review cadence, ownership model and savings tracking everywhere.

Finance-friendly reporting

Budgets, forecasts and verified savings across the whole cloud estate.

No extra headcount

Multi-cloud FinOps without hiring a dedicated specialist.

Azure cost questions, answered.

How do I reduce Azure costs without impacting performance?

Start with waste that has no performance impact at all: deallocated VMs still incurring disk charges, unattached managed disks, idle public IPs and oversized VMs running far below capacity. Emnode identifies these automatically, ranks them by monthly saving and tracks each action to completion.

How does Emnode connect to Azure?

Emnode connects through a read-only managed identity. Read-only. Emnode does not modify your infrastructure. It reads your billing, usage, compliance, backup and monitoring data, then recommends. You decide and act.

Does Emnode replace Azure Cost Management?

Emnode builds on top of what Azure's native tooling reports. Where Azure Cost Management shows spend, Emnode adds ranked savings recommendations, anomaly alerts, ownership and action tracking, plus compliance and reliability insights, and covers AWS in the same platform if you run both clouds.

Does Emnode help with Azure Reservations and Savings Plans?

Yes. Emnode analyzes your usage patterns and highlights where Azure Reservations or Savings Plans would reduce your bill, and where existing commitments are underutilized.

How long does Azure setup take?

It takes minutes with the guided setup. Your first Azure savings opportunities are typically visible in the first session.

What happens when the free trial ends?

You trial the plan you pick for 14 days, with no card needed until it ends. If you don't subscribe, your account drops to the Free tier — an open-ended high-level view across cost, compliance, reliability and monitoring — and you can upgrade whenever you're ready. No surprise charges, and you can disconnect your cloud accounts at any time.

Read-only managed identity — no agents, nothing to install UK-hosted — encrypted in transit and at rest Tenant isolation — and audit logging Security Sub-processors

Take back control of your Azure spend.

Connect Azure in minutes and see your waste, anomalies and savings opportunities today. Free for 14 days, read-only, no card to start.

From $79/month, unlimited users and unlimited cloud accounts. Free tier available. See full pricing →

AWS & Azure · 14-day free trial · No card needed until the trial ends