Reduce cloud costs today. Keep them under control tomorrow.

Emnode identifies wasted cloud spend across AWS and Azure, monitors cost trends before they become a problem, and turns every insight into an actioned, tracked saving. Find savings opportunities in minutes.

Read-only access · Set up in minutes · No card needed until the trial ends

Emnode Cost Explorer showing twelve months of cloud spend split by provider — AWS at 168,800 dollars and 60 percent with two alerts flagged, Azure at 112,600 dollars and 40 percent
Emnode Cost Breakdown for both clouds — 281,400 dollars across seven categories, Compute at 110,700 dollars and 39.3 percent, each with its own twelve-month trend

Setup

Takes minutes

A guided, read-only connection — nothing to install.

Price

From $79/mo

Unlimited users and cloud accounts.

Access

Read-only

No changes to your infrastructure.

Free trial

14 days

No card needed until it ends.

The problem

Cloud costs rise quietly. Nobody owns bringing them down.

Most teams don't overspend on the cloud deliberately. Costs creep up through idle resources, forgotten environments and spend that no single person is accountable for.

No cost visibility. The monthly bill arrives, but nobody can say which team, service or environment is driving it.

Waste hides in plain sight. Idle instances, unattached volumes and oversized resources accumulate month after month.

Recommendations get forgotten. Cost reviews produce ideas, but without ownership and tracking, nothing actually changes.

No dedicated FinOps resource. Cost management lands on engineers who already have a full-time job.

What you can cut

Your cloud waste, ranked by what it costs you.

Every opportunity across both clouds grouped by type with the monthly saving against each — right-sizing, Graviton migrations, unattached disks, idle App Service plans — so the biggest wins are obvious before anyone opens a ticket.

Emnode Action Hub listing AWS and Azure savings opportunities grouped by type — right-sizing virtual machines, idle databases, unused storage volumes, idle App Service plans — each with its monthly saving, ordered by what it costs

What's driving your cloud bill

Twelve months across both clouds, and what moved it.

Every month broken out by category against the forecast band, then the AWS and Azure services that moved the bill priced individually.

Emnode Cost Drivers showing thirteen months of combined AWS and Azure spend by category against the forecast band, the current month part-billed with its projected remainder, alongside 278,800 dollars spent across twelve complete months
Emnode showing what moved the cloud bill from June to July — Virtual Machines up 230 dollars and Amazon EC2 up 180, with Azure App Service, Storage and Amazon EBS falling, for a net movement of 600 dollars across both clouds

Where your cloud spend sits

Every category, service and account, ranked.

Spend across your whole estate, sliced by category, by service and by account, so the biggest movers surface first — whichever cloud they're in.

Emnode Cost Explorer showing the top services by spend across both clouds — Amazon EC2, Virtual Machines, Amazon RDS, Azure SQL Database and Amazon S3 — with an alert flagged against EC2
Emnode Cost Explorer showing combined AWS and Azure spend by category — Compute at 110,700 dollars, Databases, Storage and Networking — each with its own twelve-month trend and share of a bill totaling 281,400 dollars
Emnode Cost Explorer showing the top accounts by spend across both clouds — emnode-logistics-prod, EML-WMS-Prod, emnode-logistics-data, EML-Corp-Prod and EML-BI-Prod — each with its share of the bill

When something changes

Spend running outside its own baseline, flagged.

Anomaly detection watches daily cost against each account's normal range and raises what doesn't fit, so an unexpected increase surfaces while you can still do something about it — on either cloud.

Emnode flagging spend outside its baseline on both clouds — NAT gateway data processing at 540 dollars a month above baseline on emnode-logistics-prod, Azure SQL left scaled up at 420 on EML-WMS-Prod, with an earlier alert already resolved
Start free trial Book a demo

Read-only access · Set up in minutes · No card needed until the trial ends

What you get out of it

Identified, actioned, verified — and what it's worth.

Every saving tracked from the moment it's found to the moment it shows up on the bill, with the value at each stage and the health of the practice behind it.

Emnode Progress Reporting savings pipeline across both clouds — 1,276 opportunities identified worth 9,658 dollars a month, 536 claimed, 445 completed and 404 verified at 4,185 dollars a month, with the conversion rate between each stage

Savings you can prove

Verified, with a name against each one.

Every closed recommendation with the person who owned it and what it was worth per month, verified against the bill rather than estimated — AWS and Azure in the same list.

Emnode Action Hub validated list — closed AWS and Azure recommendations each with its owner and monthly saving, from right-sizing an EC2 instance at 212.60 dollars a month down to releasing idle public IP addresses at 41.60

Set up in minutes. Savings visible in your first session.

1

Connect

Link AWS or Azure with secure, read-only access. No agents, no infrastructure changes.

2

See

Cost, waste and savings opportunities surface immediately, ranked by value.

3

Act

Assign owners to recommendations and track each saving through to completion.

4

Repeat

Monthly reviews surface new opportunities as your cloud estate evolves.

FinOps without the overhead

FinOps software without enterprise complexity.

Emnode gives you the core of a FinOps platform — cost visibility, accountability and savings tracking — built for growing engineering, finance and operations teams. More than a dashboard. Less than a headcount.

One platform for every stakeholder

Finance sees budgets and verified savings; engineering sees ranked, practical actions.

Replace spreadsheets

Stop reconciling billing exports by hand. Cloud spend management with clear recommendations, in one place.

Beyond cost

Compliance, reliability and monitoring insights come from the same read-only connection, at no extra effort.

Savings you can prove

Track identified, actioned and realized savings over time and show ROI to the board.

Cloud cost optimization, answered.

What is cloud cost optimization?

Cloud cost optimization is the ongoing process of reducing wasted cloud spend while maintaining performance: identifying idle and oversized resources, right-sizing infrastructure, improving commitment coverage and building accountability so savings actually happen. Emnode automates the discovery, monitoring and tracking so it doesn't become anyone's full-time job.

How does Emnode find savings in my cloud environment?

Emnode connects to AWS and Azure with secure, read-only access and analyzes your billing and usage data. It surfaces idle resources, oversized instances, unattached storage and anomalous spend, then ranks each opportunity by value so your team can prioritize the biggest savings first.

What access does Emnode need?

Read-only. Emnode does not modify your infrastructure. It reads your billing, usage, compliance, backup and monitoring data, then recommends. You decide and act.

How long does setup take?

It takes minutes. Connect your AWS or Azure account, and Emnode starts surfacing cost, compliance and reliability insights immediately, with your first savings opportunities typically visible in the first session.

Is Emnode a FinOps platform?

Yes. Emnode provides FinOps capabilities — cost visibility, savings tracking, ownership and monthly reviews — without enterprise complexity. It's built for growing engineering, finance and operations teams rather than dedicated FinOps departments. See the FinOps platform page for more.

What happens when the free trial ends?

You trial the plan you pick for 14 days, with no card needed until it ends. If you don't subscribe, your account drops to the Free tier — an open-ended high-level view across cost, compliance, reliability and monitoring — and you can upgrade whenever you're ready. No surprise charges, and you can disconnect your cloud accounts at any time.

Read-only access — no agents, nothing to install UK-hosted — encrypted in transit and at rest Tenant isolation — and audit logging Security Sub-processors

Your cloud costs won't sort themselves out.

Connect AWS or Azure in minutes and see your first savings opportunities today. Free for 14 days, read-only, no card to start.